MIDDEL LETHABA DAM – MISCELLANIES ITEMS – ORDER NUM: PO 0000075

Phillip Van Rooyen • November 17, 2025

Technical Report: Fabrication and Installation of Miscellanies Items

1. Introduction

This report provides a summary of the fabrication and installation works carried out for the Middel Letaba Dam

project. The scope of work comprised the complete fabrication and installation of stainless steel and structural

steel components, including cat ladders, access platforms, and hand railings.


2. Project Scope

The turnkey project involved the following key activities:

- Fabrication of stainless-steel structural cat ladders.

- Fabrication of access platforms and hand railings.

- Supply, surface preparation, and installation of all fabricated components.

- Compliance with all relevant EN specifications and quality standards.


3. Material Specifications

Material Type: 316L Stainless Steel / S355JR+AR

Standard: EN Specifications

Fabrication Location: VIP Metals Workshop

Finish: Brushed / Polished (as per design specification) / Carbon Steel

All stainless-steel components were fabricated using 316L material, chosen for its superior corrosion resistance

and strength in harsh environmental conditions typical of dam infrastructure.


4. Fabrication Details

All fabrication works were executed at the VIP Metals workshop under controlled conditions to ensure

dimensional accuracy and compliance with design drawings. Welding and jointing processes were performed

according to EN welding standards, and all welds underwent visual inspection and quality verification.


5. Installation

The installation of the fabricated components was carried out at the Middel Letaba Dam site. This included:

- Positioning and securing of cat ladders.

- Assembly and installation of platforms and hand railings.

- Final alignment checks and anchoring to existing structures.


All installation work adhered to approved safety procedures and site-specific risk assessments.

6. Quality Control and Compliance

All fabricated and installed items were inspected for conformity to design, material, and dimensional

requirements. The work complied with EN standards for stainless steel fabrication and installation, ensuring long-

term durability and safety.


7. Conclusion

The turnkey project at Middel Letaba Dam was successfully completed, encompassing the full fabrication and

installation of stainless-steel cat ladders, access platforms, and hand railings. All work was performed under EN

specifications using 316L stainless steel, ensuring structural integrity and longevity of the installation.


Site allocation

Installation of works

By Phillip Van Rooyen November 17, 2025
This is a subtitle for your new post
By Phillip Van Rooyen November 17, 2025
Technical Report: Fabrication and Installation of Stainless-Steel Structural Platform
By Phillip Van Rooyen November 17, 2025
Technical Report: Cross-Dam Fabrication and Installation of Access Platform, Handrails, and Ladders at Pump Station (Over Feed Lines from Dam Wall Side)
By Phillip Van Rooyen November 17, 2025
Doorn Draai Blank Flange Project - Order Nun: PO000088